Wide Leg Pants

$15.00

  • Made in USA
  • 95% Polyester 5% Spandex
  • Stretchy; Lightweight Crepe Scuba
  • Ruching Waist with Elastic Band; Tie Belt at Waist; Wide Paneled Legs; Pull on Closure
  • Hand Wash Cold; Do Not Bleach; Line Dry in Shade; Low Heat Iron
Category:
  • Made in USA
  • 95% Polyester 5% Spandex
  • Stretchy; Lightweight Crepe Scuba
  • Ruching Waist with Elastic Band; Tie Belt at Waist; Wide Paneled Legs; Pull on Closure
  • Hand Wash Cold; Do Not Bleach; Line Dry in Shade; Low Heat Iron

Reviews

There are no reviews yet.

Be the first to review “Wide Leg Pants”

Your email address will not be published.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
  • Attributes
  • Custom attributes
  • Custom fields
Click outside to hide the compare bar
Compare
Wishlist 0
Open wishlist page Continue shopping